HANDOVER OF NO 3.4 WHARF AT HOA PHAT DUNG QUAT STEEL FACTORY

On December 15th, 2018, Đua Fat Foundation Joint Stock Company and the investor – Hoa Phat Dung Quat Steel Company conducted preliminary review and handover of No 3.4 wharf at specialized port of the priority project – Hoa Phat Dung Quat Iron and Steel Production Complex.

No 3.4 wharf is a part of a deep-water port – the item with an important role in the overall project of Hoa Phat Dung Quat Iron and Steel Production Complex. At the handover ceremony, the investor has acknowledged and praised the striving of leaders and employees of Đua Fat for ensuring schedule of many items and handing over  No 3.4 wharf on time. Especially, the construction of bored piles on the sea of Đua Fat is highly appreciated for outstanding investment and efforts to cope with many difficulties and challenges.

Overall site of No 3.4 wharf at the peak execution time

The weather at the period of time when Đua Fat employees executed the project in Central Vietnam was very complicated. Such kind of weather with rain and storm is regular in this coastal area.

The difficulty was getting more when in the process of surveying, Đua Fat discovered the bad geology – mainly granite solid rock, leading to the large number of rock drilling meters. Marine construction machinery and equipment in the domestic market could not meet both the quality of construction and the ability to operate stably in extreme weather conditions.

Jack-Up floor on the sea with 4 strong pillars, which can operate in hard weather conditions

Faced with such an extremely difficult situation, Đua Fat has invested heavily to import materials, equipment, 7,100-ton barge, 250-ton crane and added much more machines than expected. In particular, Đua Fat imported jack-up systems with doubled numbers to speed up the construction schedule of No 3.4 wharf to hand over on time. Jack-up is a self-lifting and lowering platform on the sea which can execute in extreme weather conditions (big waves, high winds) with dimensions of 36 × 18.5 × 2.9 × 1.55 and lifting capacity of 400 tons, 984 CV capacity. The floor has four hydraulics feet. A total length of each foot is  35 m,

In Vietnam, Đua Fat is the first mechanical construction company using Jack-up lift floor technology in the field of marine foundation treatment. The investment in modern equipment not only contributes to speed up the construction progress but also increases the position and competitiveness of Đua Fat in the construction market of domestic and foreign wharves, completely equal to foreign company.

The highly concentrated working atmosphere on Hoa Phat Dung Quat site

In addition to 24/7 on duty, and timely guidance on changing the amount of materials and equipment for the project, the Đua Fat leadership also focused drastically on the work. Đua Fat team from the front line at the site to the home office raised the spirit and tried its best day and night to speed up the progress to complete the item, to step up the handover of the No 5.6 wharf construction in February 2019. The last days of the year at Hoa Phat construction site was filled with bustling machine sound, urgent and hustle working atmosphere. Now, hundreds of Đua Fat employees welcome a new year on a dusty site, night lights and joyful eyes, beliefs, determination to achieve goals, keep the trust from the leadership and the investor.

[ĐUA FAT] Video Sàn Jack-up hoạt động trên công trình Khu liên hợp gang thép Hòa Phát Dung Quất