Project Name: Duafat Kim Son Multi-functional Service Port
Address: Kim Tan Commune, Kim Son District, Ninh Binh Province
Construction Scale: 172,716.4 m2
Total Investment: 450 billion VND
Designed Capacity: Handling 3 million tons of goods per year
The Duafat Kim Son Multi-functional Service Port project officially commenced on March 26, 2022, with Duafat Corporation as the investor.
The project is located approximately 45 km from the center of Ninh Binh city, 15 km from Phat Diem town, 100 km from Hanoi, and 140 km from Noi Bai International Airport. The transportation system, including road and waterways, is highly convenient, connecting to various regions through national highways 10 (old and new), national highway 21B, provincial road 481, and water routes via the Day River, Vac River, Can River, Giang River, Vuc River, Ca Mau River, and Hoanh Truc River.
The project includes the following components: 5 port bridges with a designed capacity of handling 3 million tons of goods per year, transportation services for 1 million tons per year, and the construction and repair of 12 and 36 vessels per year, respectively, with the ability to accommodate ships with a maximum load of 10,000 tons.
The Duafat Kim Son Multi-functional Service Port is situated within the planned economic belt of Kim Son’s coastal area, connecting to the domestic transportation system and trade in the region. The project plays a pivotal role in the strategy to develop river and sea capabilities, contributing to the economic development of the local area.